Your first 30 days in your new home in Nerja: the complete checklist
You have signed at the notary, you have the keys in your hand and now comes what many buyers do not expect: a list of practical tasks that are best done properly from day one. Utilities, insurance, community fees, locks, the padrón, property tax, checking the property... Done in order, it is not complicated. Left for later, it tends to turn into problems.
This guide gives you a checklist for your first 30 days in a newly bought property in Nerja, whether it is a resale or a new build, and whether you will live here, use it as a second home or hold it as an investment.
Day 0: Signing Day and Key Handover
The first steps happen before you even leave the notary's office or the property itself:
- Gather the documents you are given: a copy of the deed, the nota simple, the energy certificate and any manuals, warranties or instructions for the property and its installations.
- Take photos and video of the property's condition the same day. If a defect appears later, it will serve as evidence of how you received it.
- Record the meter readings for electricity, water and gas, if there is one, and photograph them.
- Check every key and remote: front door, garage, storage room, gate, pool, mailbox, alarm.
- Sign the handover record if one is offered, and note any visible issues on it.
- Have home insurance active from that day. Do not leave it until after the move.
Days 1 to 3: Security and Initial Inspection
Change the Lock
In a resale property, there is no way to know how many copies of the keys exist: previous owners, tenants, agents, technicians or relatives. Changing the cylinder or lock is inexpensive and gives you peace of mind from day one.
One important exception: if you buy a property that is still rented out, you cannot change the lock without the tenant's consent. We explain this in our article on changing the locks on a rental property.
Do a Full Inspection, Room by Room
Set aside an afternoon to go through the property calmly. Check:
- Damp, stains, cracks or peeling paint on walls and ceilings.
- Windows, doors, shutters and insect screens: that they open, close and seal properly.
- Taps, showers, toilets and drains: pressure, leaks and correct drainage.
- Electrical panel, sockets and lighting.
- Air conditioning, heating and hot water.
- Terraces, roof and railings.
- If there is a pool: filter, pump, lighting, condition of the pool shell and safety cover.
- If there is a garden: irrigation, planting and condition of the fencing.
If You Buy New Build, There Are Specific Steps
- Inspect the property in detail before or during handover and record any finishing defects in writing, known as "remates".
- Check which documents the developer provides. They must give you the Building Book (Libro del Edificio), which includes the project, the completion certificate and the use and maintenance instructions, and evidence of the ten-year insurance.
- Know your warranties. The Building Regulation Act sets periods of 10 years for structural defects, 3 years for defects affecting habitability and 1 year for finishing defects, counted from the completion of the works. Ask the developer for that date, because the periods depend on it.
- Report defects in writing and as soon as possible, using a method that leaves a record.
If you are considering this route, there is more information in our guide to new build property in Nerja and the Eastern Costa del Sol.
Week 1: Utilities and Insurance
Electricity, Water, Gas and Internet
In a resale property, you will normally need to change the name on the existing utilities. Companies usually ask for your ID or NIE, proof that you own the property, such as the deed, and the supply details. In a new build, it may be a brand new connection, which requires technical documentation for the installation: ask the developer what has already been arranged and what you need to do yourself.
If you are an international buyer, you will need a Spanish bank account to set up direct debits. It is one of the first things to have sorted. We also cover this in our guide to costs and taxes when buying property in Andalusia.
Home Insurance
It is not generally required by law, but the bank usually insists on it if you buy with a mortgage, and it is highly advisable in any case. Check that it covers:
- Building: the structure and fixed installations of the property.
- Contents: furniture, appliances and personal belongings.
- Liability: damage to third parties.
- Specific elements: pool, garden or outdoor installations, if any.
If you will spend long periods away, check the policy terms: some limit cover for unoccupied properties after a certain time.
Weeks 2 and 3: Community, Padrón and Taxes
Owners' Community
- Contact the administrator and give them your ownership and contact details.
- Ask for the bylaws, the latest minutes and the house rules: pool, parking, noise, building work.
- Check the fee and whether any special levies have been approved or are planned.
- Set up a direct debit for the fees.
In general, the law makes the property answerable for community debts from the current and previous year. That is why it is wise to have requested the certificate confirming there are no arrears before buying.
Registering on the Padrón
Anyone who lives habitually in a municipality must register on its padrón. If you are moving to live in Nerja, the process is handled by the Town Hall, which manages the padrón; check there for the current requirements and documents. Registering as a foreigner does not on its own prove legal residence in Spain, but it is the starting point for many procedures. If your property is a second home and you live most of the year in another country, your habitual home is abroad and you would not need to register here.
Property Tax (IBI) and Other Municipal Charges
- Check that the owner on the Town Hall and Cadastre records is correct.
- Set up a direct debit for IBI and the refuse charge so you do not miss payments.
- Agree with the seller how the IBI for the year of purchase is apportioned, if it was not settled at signing.
If you are not resident in Spain, remember your obligations as a non-resident too, which we explain in the annual taxes section of our costs and taxes guide.
Week 4: Setting Up and Maintenance Plan
- Pool: decide who looks after maintenance, how often and what products it needs.
- Garden and irrigation: in Nerja, summer calls for water and winter for pruning and checks.
- Climate control: schedule a service before the season you will use it most.
- Damp and ventilation: in winter, a closed-up property can develop damp. Ventilate and watch the risk areas.
- Improvements: if you want to renovate or upgrade, you will find ideas in our article on home improvements to increase your property's value in Nerja.
- A trusted person in Nerja: if you will be away, someone should be able to open up, check the property and deal with incidents.
Decide How You Will Use the Property
In these first 30 days it is also worth clarifying what you want to do with the property: live in it, use it as a second home, rent it long term or put it on the holiday rental market. If you are considering the last option, check the requirements first, such as the first occupation licence, and consider working with a team that manages marketing, bookings, maintenance, cleaning and key handover.
Summary: The 30-Day Checklist
- Day 0: documents, photos and video, meter readings, keys, handover record and insurance active.
- Days 1 to 3: lock, full inspection and, for new build, defects in writing and the developer's documentation.
- Week 1: utilities, bank account, direct debits and insurance.
- Weeks 2 and 3: community, padrón if applicable, IBI and charges.
- Week 4: pool and garden maintenance, climate control, damp and a decision on use.
Frequently Asked Questions
When should I take out home insurance?
Ideally it should be active on the day of signing and key handover. If you buy with a mortgage, the bank usually requires it.
Do I need to register on the padrón if I buy a second home in Nerja?
The padrón corresponds to the municipality where you habitually live. If you spend most of the year in another country, you would not need to register in Nerja. If you are unsure about your case, check with the Town Hall or an adviser.
What should I do if I find defects in a new build property?
Report them to the developer in writing as soon as possible, using a method that leaves a record, and keep photos and documents. The statutory warranty periods are 1, 3 or 10 years depending on the type of defect.
Should I change the lock on a resale property?
It is highly advisable, because you do not know how many copies of the keys exist. The only exception is a property that is still rented out, where you cannot change it without the tenant's consent.
Start Your New Life in Nerja Well
At Narixa Villas we support buyers in Nerja and La Axarquía before, during and after the purchase, and we also manage long-term and holiday rentals if you want to make your property earn. If you are thinking of buying or have just done so, get in touch with no commitment. You can also discover our villas for sale in Nerja.
Disclaimer: this article is for information only and does not constitute legal or tax advice. Procedures and requirements may vary depending on your case and change over time; confirm them with the Town Hall, the utility companies or a qualified professional.
Suscríbete a nuestra Newsletter
Suscríbete a nuestra newsletter y entérate de todas nuestras novedades, noticias y promociones.